Skip to content

Headwater

Projected Completion Date: In Progress
Franklin

The Headwater project required extensive site development across a large rural property, beginning with the construction of a half-mile private driveway designed to provide long-term durability and reliable access. The scope also included the installation of two bridges, carefully engineered and constructed to accommodate terrain changes and water crossings along the route.

Tudor Building Group completed full pad preparation for a 10,000-square-foot main residence, as well as a guest house and barn. Our team performed grading, stabilization, and site balancing to ensure each structure was built on properly compacted, infrastructure-ready foundations.

From access improvements to structural pad development, this project demonstrates our ability to execute complex sitework in challenging terrain while delivering precision and long-term performance.

Contact for more info