Skip to content

Runway Logistics

Completed: Summer 2025
Nashville

Runway Logistics 1 involved full-site civil development to support a 150,000-square-foot industrial warehouse. The project required comprehensive mass grading operations to establish proper elevations, drainage patterns, and a stabilized building footprint capable of supporting large-scale industrial use.

Tudor Building Group completed stormwater infrastructure installation, including an underground StormTech detention system and bio-retention ponds designed to manage site runoff and meet regulatory requirements. Our team also installed sanitary sewer utilities and constructed a shot rock building pad to provide a durable, load-bearing foundation for vertical construction.

From earthwork and underground systems to final pad preparation, this project reflects our ability to deliver efficient, high-performance infrastructure for large-scale industrial developments.

Contact for more info