Skip to content

June Lake Subdivision

Completed: 2022
The Preserve at June Lake—Spring Hill, TN
Spanning 7 acres of rural land at the intersection of Buckner Lane and Twin Lakes Drive in Springhill, this comprehensive project faced its most formidable challenge in the creation of an underground stormwater detention system. The excavation process involved removing more than 4200 cubic yards of material to accommodate a system approximately 50 feet wide, 200 feet long, and 8 feet deep.

This underground stormwater detention system was a pivotal aspect of the project, serving a dual-purpose by not only effectively managing stormwater but also allowing for the creation of four additional buildable lots on the western side of the property. This innovative solution replaced the conventional open detention pond, optimizing land use in the neighborhood.

Beyond stormwater management, the project included extensive infrastructure work, encompassing the installation of over 2000 linear feet of sewer, water, storm, and electrical lines. Additionally, asphalt paving and curbing were implemented throughout the neighborhood to enhance accessibility and functionality. The entire endeavor, managed in collaboration with Benesch Civil Engineer for June Lake, spanned 8 months, concluding in 2022.

Contact for more info